Extension or roof extension
For extensions it must first be checked whether the plan needs a permit or falls under a different route.
Does your plan need an environmental permit, a notification, or is it permit-free? We find out which route suits your activity and location. If an application is needed, we take care of the drawings, the technical justification and the guidance, up to and including answering questions from the competent authority.
First determine which procedure applies, then prepare the application or notification carefully.
For extensions it must first be checked whether the plan needs a permit or falls under a different route.
For a load-bearing wall, stair opening or roof terrace, structural starting points and calculations are often part of the justification. Structural calculations
Facade changes and new window frames often involve the zoning plan and design review. Window frame drawings
When an owners' association replaces a roof, repairs a facade or carries out sustainability work, the required consent must be checked per activity.
With a different function or layout, building, use and zoning plan rules can come together.
We assess whether your plan can go ahead without a permit and which points you then still need to watch.
In Amsterdam-Amstelland, zoning plan rules, design review requirements and conditions for heritage or characteristic buildings can affect your plan.
Taking this into account early in the design makes choices better founded and results in a coherent set of application documents.
Which documents are needed differs per activity and per competent authority. That is why we do not work with a fixed list of documents.
The Omgevingsloket gives a first indication: permit required, notification required or information required.
Is it about building, demolition, use, deviating from the zoning plan or a combination of these?
Check which authority decides in your situation; it is not always the municipality.
We prepare the drawings, calculations, photos and any surveys your project needs.
The application or notification goes through the Omgevingsloket. We help with requests for additional information and technical questions.
Even without an environmental permit, the technical rules of the Buildings Decree (Bbl) still apply, such as requirements for structural safety, fire safety and health.
Some extensions and outbuildings in the rear yard and smaller changes can be permit-free, within the limits the Bbl sets on area, height and distance, among other things. Whether that applies to your plan depends on the activity, the location and the rules.
A wrong assessment can lead to enforcement or to a permit that turns out to be needed after all. If in doubt, a short assessment beforehand is the safest route. We also point out the issues that still need attention, such as the structure for an opening or the effects on neighbours and boundaries.
A complete file is not needed to discuss your question. With clear basic information we can determine more quickly which route applies.
That depends on the activity, the location and the rules that apply to the plot. So start with the permit check (Vergunningcheck) in the Omgevingsloket.
No. Which authority decides differs per activity and situation. For some activities, for example near water or in a restricted zone, it is a different competent authority.
Yes. Some activities need a notification rather than a permit. The Omgevingsloket shows which route applies to your situation.
Often site plans, floor plans, elevations and sections of the existing and new situation, structural information, photos and a short plan description. What exactly is needed depends on the project and the competent authority.
No. Even without a permit, the technical rules of the Buildings Decree (Besluit bouwwerken leefomgeving) still apply, such as requirements for structural safety, fire safety and health.
Preliminary consultation with the competent authority can help to get a clearer picture of feasibility and the documents needed, especially for complex plans or several activities at once.