Removing or opening up a load-bearing wall
For an opening in a load-bearing wall, we investigate how the load is taken over and which beam, lintel or portal frame is suitable.
As soon as the load path, stability or loading of a building changes, it must be shown that the new situation is structurally sound. We make structural calculations that suit the available data and record which starting points, assumptions and checkpoints apply to your plan.
For a change to the load-bearing structure of a house, apartment or other existing building. It is clear in advance what can and cannot be soundly justified.
For an opening in a load-bearing wall, we investigate how the load is taken over and which beam, lintel or portal frame is suitable.
For a new span, we calculate load-bearing capacity, bearings and connections, matched to the existing structure.
If walls, floors or roof parts provide bracing or diaphragm action, we assess whether stability is maintained after the intervention.
With a heavier load, signs of settlement or doubts about the subsoil, a foundation assessment can be part of the process.
For changes to a floor or roof, we map out the effect of new loads, openings, trimming and strengthening.
If drawings are missing or differ from reality, we work with a survey, archive research and explicitly recorded assumptions.
A photo or rough floor plan is usually not enough. The process often consists of a survey, drawing, calculation and an explanation of the assumptions and limitations.
Calculations are made in accordance with the relevant structural standards. The scope depends on the building, the intervention, the available data and the purpose of the documents.
The structural calculation shows that an element is strong and stiff enough. The structural drawing shows exactly what has to be built.
A structural drawing for your house or home is often part of the permit application and is the starting point for construction and fabrication for the contractor or steel fabricator. Looking for the original structural drawing of your home? It is sometimes in the building file. Requesting building drawings and the building file
Read more about structural engineering in Amsterdam at structural calculations and structural drawings by Aboss Bouwadvies (in Dutch).
First the existing situation, then the structural concept and then the calculation. When information is limited, we record which parts are certain and which still need to be checked.
What changes, which part of the building is involved, and is the calculation intended for the permit, for construction or for a first feasibility check?
We collect available drawings, photos and archive documents and check on site what is visible and measurable.
Load path, spans, bearings and elements are translated into a model that can be calculated.
The relevant elements are checked for strength, stiffness and stability.
The outcome is recorded with assumptions, limitations and any next steps towards the competent authority or construction.
A complete file is not needed to discuss your question. With the right basic information we determine whether a calculation is possible straight away or whether a survey is needed first.
Which activity, consent or technical justification is needed depends on the plan, the location and the existing situation. The permit check (Vergunningcheck) in the Omgevingsloket gives a first indication; the competent authority assesses the application. Even if you do not need a permit, the technical requirements of the Buildings Decree (Bbl) still apply, such as structural safety.
Usually yes, because the load has to be carried in a different way. What exactly is needed depends on the project and on the assessment by the competent authority.
Often yes, based on a survey, archive research and explicitly recorded assumptions. If the existing situation cannot be established well enough, further investigation may be needed.
A beam calculation focuses on one or more load-bearing beams and their span. A portal frame calculation also includes the posts, the connections and the behaviour of the structure as a whole.
When walls, floors or roof parts do not only carry loads but also contribute to the bracing or diaphragm action of the building. After a change, it must be checked that stability is maintained.
No. The calculation is a technical justification, not a procedure. Whether and how an application is needed depends on the plan and the location; the competent authority assesses the application.
Then the calculation must be adjusted or supplemented with an extra survey or check. The outcome is only reliable within the recorded starting points and the observed situation.
A drawing of the load-bearing structure that belongs to the structural calculation. It shows, among other things, the position and size of beams, columns and portal frames, the profiles, the bearings and the connections.